Kitchen Electrical

Home/ Services/ Electrical/ Kitchen electrics
Kitchen electrics · Amsterdam and surroundings

A modern kitchen needs four dedicated circuits — most homes have one.

Kitchen electrics in Amsterdam from € 1.450 including 21% VAT. A modern kitchen needs three to four dedicated circuits — induction, oven, dishwasher and general sockets — and induction with a wok zone needs three-phase. Count what yours needs below.

Full kitchen from € 1,450 Aligned with your kitchen planning Custom worktop sockets 5-year warranty
3 – 4
dedicated circuits a modern kitchen needs
7,4 kW
what induction with wok zone draws — more than 1×25 A delivers
2 – 3 dagen
electrics in a full kitchen renovation
1 moment
when it must happen: before the kitchen arrives
Kitchen circuit check · 30 seconds

Kitchen circuit check: tick your appliances and we calculate the circuits, the phase requirement and the cost.

Tick which appliances will be in your new kitchen. We calculate how many dedicated circuits that needs, whether single phase still suffices, and what the kitchen electrics cost.

Your result
eigen groepen nodig
Send my result via WhatsApp Request a callback

Indicative price for kitchen electrics, assuming an existing consumer unit with space. If your unit is full, an extension or new unit is added.

VAT display
Electrical work is always charged at 21% VAT. When does 9% or 0% apply?
The four circuits of a kitchen

The four kitchen circuits, and why sharing them is what trips your fuse.

A 16-amp circuit delivers about 3.6 kilowatts at 230 volts. An oven draws 3.5, a dishwasher 2.2 and a kettle 2.2. Two of those three at once and you are over the limit. That is the whole story, and the fix is just as simple: put them on separate circuits.

Circuit 1 · General worktop

General worktop sockets

The sockets for the kettle, coffee machine, toaster and blender. Allow for six to eight points along the worktop — more than people expect in advance, and adding them later costs twice as much.

groep + puntenfrom € 265

Circuit 2 · Hob

Hob

Single-phase induction runs via a perilex connection and is limited to about 3.7 kW. With a wok zone or teppanyaki it becomes 7.4 kW and needs three phases — then two circuits go to it.

aansluiting€ 285

Groep 3 · Oven

Oven

A built-in oven draws up to 3.5 kW and runs for a long time. If it shares a circuit with the worktop, it is only a matter of time before you are in the dark at Christmas. A steam oven or second oven gets its own circuit.

per apparaat€ 175

Groep 4 · Dishwasher

Dishwasher

Not only because of the power, but because of pump leakage current. A dishwasher near end of life trips a shared RCD — and half your home goes with it.

per apparaat€ 175

Extra · Quooker

Boiling water tap

A boiling-water tap has a reservoir that stays hot and needs its own connection under the sink. Ask your kitchen supplier where the tap sits before we pull the cable.

aansluiting€ 175

Extra · Drie fasen

Three-phase

With induction with a wok zone unavoidable. Our installation work is € 695; the grid operator charges roughly € 369 once for 3×25 A — and your annual standing charge stays the same.

installatiewerk€ 695

The misconception: „the kitchen supplier handles the electrics”

A kitchen supplier delivers and fits the kitchen and connects appliances to what is there. What they do not do is add new circuits, pull cables or alter the meter cupboard — they often may not. If your kitchen quotation says “connect to existing supply”, that is exactly what happens: your new induction hob hangs on the 1985 circuit.

The detail you notice for ten years

Where the sockets go, and why that has to be decided before the tiler arrives.

Moving a socket afterwards costs € 135 plus tiling plus a repair you will always see. Planning it properly beforehand costs half an hour at the kitchen table. This is what we discuss then.

Height above the worktop

Typical is about 110 to 120 cm from the floor, or 15 to 20 cm above a 92 cm worktop. Low enough to disappear behind a toaster, high enough to reach with a pan on the surface. If there is a glass or stone splashback, that sets the final height — so we align with your kitchen supplier before we drill.

How many per metre of worktop

Our rule of thumb: one double socket per metre of continuous worktop, with at least two where the coffee machine will sit. Sounds excessive until you count what stays plugged in permanently — kettle, coffee machine, toaster — and what gets added temporarily: stick blender, food processor, phone charger.

Kookeiland zonder achterwand

This is where a worktop socket block comes in: a pop-up or rotating unit flush in the surface. Costs € 245 and needs a cut-out from the worktop supplier — so that must be on your kitchen drawing, not in our head. Alternative is a socket in the side of the island, cheaper but less convenient.

Wat er achter de kastjes hoort

Dishwasher, oven and fridge get their socket in the adjacent cupboard, not behind them — then you can unplug without pulling the appliance out. The extractor gets its point in the wall unit. And under the sink goes the boiling-water tap connection, with enough space beside the reservoir.

Away from the worktop

Do not forget the dining table if it is in the kitchen, and think of a point where you put the phone. A data outlet for a TV or speaker costs € 165 and is impossible afterwards without chasing again.

Our standard positions
Height above the floor110 – 120 cm
Above the worktop15 – 20 cm
Dubbele contactdozen1 per metre blad
Bij de koffiemachinemin. 2
Dishwasher en ovennaastgelegen kastje
Afzuigkapin bovenkastje
Quookeronder spoelbak
Kookeilandwerkbladcontactdoos

Send us your kitchen drawing

If you already have a design from your kitchen supplier, email it along. We mark the electrical points on it and send it back — then you see before the order what is coming and what it costs, and your kitchen supplier can plan the right cut-outs straight away.

Timing

The order of work with your kitchen supplier, and why it cannot be reversed.

With kitchens it almost never goes wrong in the technology but in the planning. The kitchen is in, and then it turns out the hob needs a connection that is not there. This is how you prevent that.

Fase 1 · zodra u de keuken kiest

Tekening en apparatenlijst

Even before you sign with the kitchen supplier: send us the drawing and appliance list. We then say whether your meter cupboard can handle it and whether an upgrade is needed — that is a weeks-long process at the grid operator.

Fase 2 · oude keuken eruit

Strip-out and remove old electrics

When the old kitchen is gone and the walls are bare, this is the cheapest moment for everything we do. All old wiring and junction boxes out.

Fase 3 · 1 – 2 dagen

Chasing, cabling and circuits

Chase grooves, new cables in conduit, fit junction boxes and pull the new circuits to the meter cupboard. This is when positions become final — moving afterwards costs tiling.

Fase 4 · zelfde week

Adapt the consumer unit and test

Adding circuits or a new unit, setting RCD protection, and a measurement while the walls are still open. A fault found now costs an hour; after tiling it costs a day.

Fase 5 · wachten

Stukadoor, tegelzetter, schilder

We hand over plaster-ready. If we also do plastering and tiling, we schedule it back-to-back — and plastering falls under 9% VAT.

Phase 6 · kitchen is installed

De keukenmonteurs

Cabinets, worktop and appliances. They connect to what we prepared. Make sure they know where our points are — we supply a drawing for that.

Fase 7 · een dagdeel

Finishing and handover

Fit sockets and switches in the brand you chose, connect and commission lighting, make the final cooker connection, test everything and hand over with a test certificate.

Het weekverschil dat mensen verrast

If at phase 1 it turns out you need to upgrade to three phases — for example because you chose induction with a wok zone — that takes four to ten weeks at the grid operator. If you only discover that after the kitchen is ordered, your new hob sits idle in the box for weeks. One email with the appliance list prevents that.

Kitchen lighting

Kitchen lighting: three layers and the right colour temperature for each.

The kitchen is the only room where you work with knives and need to judge food colour. That needs different light from the living room, and it is not a matter of taste.

01

Onder de bovenkasten

Under-cabinet lighting

The most important light source in a kitchen, and the most often skipped. Without it you cut with your own shadow on the worktop. LED strip or separate fittings, dimmable, with the switch at the kitchen entrance.

from € 295 per kitchen
02

Boven het kookeiland

Island lighting

Pendants or a row of recessed spots, on their own switch so you can run only that part. Allow three spots per two metres of island, or two to three pendants. The position must be on the kitchen drawing — moving a pendant is a hole in the ceiling.

set van 6 spots € 690
03

Algemeen plafondlicht

Ambient ceiling light

For when you only walk through the kitchen. Often the same spots as in the adjoining living room, at 2,700 K so the transition is not jarring. On a dimmer so it can be calm in the evening.

spot € 95 · dimmer € 135

Why 3,000 K and not 2,700 K above the worktop

Warm 2,700 K light is pleasant in a living room but dulls colours — meat and vegetables look different from how they are, and you see less sharply where you cut. Above a worktop we therefore advise 3,000 K with good colour rendering (CRI 90 or higher). The difference is subtle viewed alone and obvious side by side.

More about recessed lighting and lighting plans →

Kitchen electrics prices · 2026

Kitchen electrics price list 2026, including 21% VAT.

Including materials, labour, chasing and plaster-ready making good. You buy luminaires and appliances yourself; we fit and connect them.

Turnkey kitchen
Keuken volledig voorbereiden en afmonteren — basisper kitchen€ 1.450
Full kitchen, with island and lots of appliancesper kitchen€ 1.900 – 2.400
Kitchen with 3-phase induction, incl. upgradeper kitchen€ 2.400 – 3.200
Electrical drawing based on your kitchen designper kitchen€ 0
Circuits & appliance connections
Add a circuit — first circuitper circuit€ 265
Add a circuit — each further one in the same visitper circuit€ 195
Connect induction hob (perilex or 3-phase)per connection€ 285
Connect an oven or combi microwaveper apparaat€ 175
Connect dishwasherper apparaat€ 175
Connect a Quooker or boiling-water tapeach€ 175
Connect an extractor hood or ceiling uniteach€ 135
Connect washer or dryer on its own circuitper apparaat€ 195
Upgrade 1 → 3 phase, installation workper home€ 695
Grid operator fee for upgrade to 3×25 Aone-off, passed through± € 369
Outlets & data
Socket above the worktop — doubleper punt€ 165
Socket with USB-Cper punt€ 195
Werkbladcontactdoos, uitklapbaareach€ 245
Socket in the side of a kitchen islandper punt€ 185
Data or TV point in the kitchenper punt€ 165
Relocate a socketper punt€ 135
Chasing in brickper metre€ 17
Close the chase, plaster-readyper metre€ 14
Lighting
Lighting onder de bovenkasten, compleetper kitchen€ 295
LED-strip in nis of plint, incl. driverper metre€ 68
Fit and connect a recessed spotper spot€ 95
Set of 6 recessed spots above the islandper set€ 690
Hanglamp boven eiland monterenper luminaire€ 125
Dimmer matched to LED loadper dimmer€ 135

All amounts include materials, labour and 21% VAT, valid in 2026 for Amsterdam and surroundings. If you combine the kitchen with plastering and painting from us, that part falls under 9% VAT and we split the invoice. VAT explanation →

Frequently asked questions

Frequently asked questions.

How many circuits does a modern kitchen need?

Three to four dedicated circuits. One for general worktop sockets, one for the hob, one for the oven and one for the dishwasher. Add a second oven, boiling-water tap or washing machine and it becomes five or six.

The reason is simple: a 16 amp circuit delivers about 3.6 kilowatts. An oven draws 3.5, a dishwasher 2.2 and a kettle 2.2 — two of those at once on one circuit and the breaker trips. Use the circuit check at the top of this page to see what your kitchen needs.

What does electrics in a new kitchen cost?

Fully preparing and finishing a basic kitchen costs € 1,450 including 21% VAT: three to four new circuits, cables, junction boxes, worktop sockets, appliance connections, chasing and plaster-ready making good.

With an island and lots of appliances it becomes € 1,900 to € 2,400. Choose induction with a wok zone and need three phases for that, and you reach € 2,400 to € 3,200 including the upgrade — the grid operator’s one-off fee of about € 369 is still separate.

Do I need three phases for induction?

For a standard induction hob no: it can run on single phase via a perilex connection, limiting itself to about 3.7 kilowatts. In practice you only notice that if you cook on four zones at full power at once.

For a hob with a wok zone or teppanyaki, yes. That draws up to 7.4 kilowatts, more than a 1×25 A supply can deliver at all. Our installation work for the upgrade is € 695 and the grid operator charges roughly € 369 once for 3×25 A. Important: your annual standing charge does not rise, because 1×25 A and 3×25 A sit in the same tariff band.

When should the electrician come during a kitchen renovation?

Two moments. The first is before you order the kitchen: send us the drawing and appliance list, then we say whether your meter cupboard can handle it and whether an upgrade is needed. That last step takes four to ten weeks at the grid operator, and you do not want to discover that after the kitchen has already been delivered.

The second moment is after the old kitchen is out and the walls are bare, and before the tiler arrives. Then we run cables, fit the circuits and test while everything is still open. Then we return once more for finishing after the kitchen is installed.

Doesn’t my kitchen supplier handle the electrics?

A kitchen supplier delivers and fits the kitchen and connects appliances to what is already there. What they do not do — and usually may not — is add new circuits, pull cables or alter the meter cupboard.

If your kitchen quotation says ‘connect to existing supply’, that is literally what happens: your new induction hob hangs on the circuit laid in 1985. Ask your kitchen supplier explicitly what is and is not included, and let us see the drawing before you sign.

At what height do the sockets sit above the worktop?

Typical is 110 to 120 centimetres from the floor, or 15 to 20 centimetres above a 92-centimetre worktop. Low enough to disappear behind appliances, high enough to reach with a pan on the surface.

If there is a glass, stone or continuous-tile splashback, that sets the final height and layout. That is why we align it with your kitchen supplier before we drill — moving afterwards costs € 135 plus tiling plus a repair you will keep seeing.

How many sockets do I need in the kitchen?

Our rule of thumb is one double socket per metre of continuous worktop, with at least two where the coffee machine will sit. That sounds excessive until you count what stays plugged in permanently — kettle, coffee machine, toaster — and what gets added temporarily.

For an island without a splashback, a worktop socket block is the neat solution: a pop-up unit flush in the surface, € 245. That does need a cut-out from the worktop supplier, so it must be on your kitchen drawing.

Can I stay in the home during the work?

Yes. Kitchen electrics are two to three days of work across two visits: one when the walls are bare and one for finishing after the kitchen is in. You are without power for a few hours in the meter cupboard during the work, otherwise not.

The kitchen itself is unusable for days to weeks — but that is set by the kitchen renovation as a whole, not by the electrics.

Do you do kitchen electrics for English-speaking clients?

Yes. A full kitchen — three to four dedicated circuits, wiring, junction boxes, worktop sockets, appliance connections, chasing and making good — costs € 1,450 including materials, labour and 21% VAT, or € 1,900 to € 2,400 for an island kitchen with a lot of appliances.

Send us your kitchen supplier’s drawing and appliance list before you sign: we will tell you whether your consumer unit can handle it and whether the supply needs upgrading to three-phase, which takes four to ten weeks at the grid operator. Induction hobs with a wok zone always need three-phase.

Callback request · 30 seconds

Request a callback — pick a time that suits you and we call within that window.

Send us your kitchen supplier’s drawing and the appliance list — then within a day we say whether your meter cupboard can handle it and whether you need to upgrade.

01

Within 4 hours on weekdays

If you choose “as soon as possible”, we call within four hours during office hours. Outside those hours, the next morning.

02

An electrician, not a call centre

You speak to someone who does the work and can already say on the phone what is going on and roughly what it costs.

03

Dutch, English, Russian or Ukrainian

Tell us which language you prefer and we will make sure the right colleague calls.

04

No cost, no obligation

The home survey is free too, with no call-out fee. You are not committed to anything.

Faster: send a photo of your meter cupboard now

One photo of the open meter cupboard tells us more than ten minutes on the phone. We look at it free of charge and say honestly whether anything needs doing — even if the answer is “no”.

Send photo via WhatsApp
All Reviews 5.0google logoGoogle 5.0
Overall Rating
5.0 8 reviews