EV Charger Installation

Home/ Services/ Electrical/ EV charger installation
EV charger installation · Amsterdam and surrounding area

EV charger installation: the install costs more than the unit — and almost nobody says so.

EV charger installation in Amsterdam. Dedicated circuit, cable run to your driveway or garage, load balancing and commissioning — from € 850 including materials and 21% VAT, excluding the charger itself. Three-phase upgrades and shared VvE garages included.

Installation from € 850 incl. VAT Load balancing offered as standard Also charging points in VvE garages 5-year warranty
€ 850
11 kW installation, excl. the charger itself
± € 369
one-off at the grid operator if you need a phase upgrade
€ 0
extra annual standing charge at 3×25 A
3 – 6 hours
fitting and commissioning, usually half a day
Step 1 — which charging power do you want?

All amounts are guide prices for the installation including materials, labour and 21% VAT. You buy the charger itself separately; below you will see roughly what that costs.

Step 2 — what do you have in the meter cupboard now? shown on your main switch
Step 3 — distance from meter cupboard to charge point

Measure the route the cable actually takes, not the straight line. The first ten metres are in the base price.

15 m
5 – 60 metres
5 m15 m30 m45 m60 m
Step 4 — situation and options fixed amounts, incl. 21% VAT
VAT display
Electrical work is always charged at 21% VAT. When does 9% or 0% apply?
Installation — incl. materials, labour and 21% VAT
€ 0
 
Range ± 15%
 
Comes on top — grid operator
none

Your current supply is sufficient.

Comes on top — the charger itself
€ 1.000 – € 2.500

Market price; you buy it yourself or through us with no markup. We advise on brand and features.

Choose your situation above — we calculate with you.
Visible immediately, with no form. After a short check of your meter cupboard — a photo is enough — you receive a fixed quote within 24 hours.
The first choice

7.4, 11 or 22 kW: how fast you actually need to charge at home.

Almost everyone wants the fastest charger at first. Then look at how you actually charge: a car that plugs in at six in the evening and leaves at seven in the morning has thirteen hours. At 7.4 kW that is already well over five hundred kilometres.

7.4 kW · 1 phase11 kW · 3 phase22 kW · 3 phase
Charge speed± 40 km per hour± 60 km per hour± 120 km per hour
Full battery (60 kWh) from 20 to 80%± 5 hours± 3.5 hours± 1.5 hours
Needs 3 phaseNoYesYes, and often heavier than 3×25 A
Will your car take it?AlwaysVirtually all modelsOnly with a 22 kW onboard charger — rare
Installation with usfrom € 625from € 850from € 1.150
The charger itself€ 500 – 1.200€ 1.000 – 2.500€ 1.200 – 2.500
Phase upgrade needed from 1 phaseNoYesYes
Suitable forOne car, overnight at homeMost householdsTwo cars or heavy business mileage

Our advice in one sentence

Take 11 kW if you are upgrading anyway or already have three-phase, and 7.4 kW if you have single-phase and do not drive three hundred kilometres every day. At home, 22 kW is almost always wasted money: most electric cars have an 11 kW onboard charger and cannot take that speed at all — the charger then simply delivers 11 kW, but you have paid for more.

The invoice that is not from us

What the grid operator charges — and the detail that saves you hundreds a year.

Upgrading to three-phase is two invoices. We do the electrical work in your meter cupboard, from € 695. The grid operator — in Amsterdam that is Liander — adapts the supply and sends its own invoice of about € 369 for an upgrade to 3×25 A. That invoice does not run through us; we do handle the application and align the schedule.

The detail that saves you hundreds of euros a year

The grid operator groups supplies into tariff bands. 1×25 A and 3×25 A fall into the same band. Upgrading to 3×25 A therefore does not raise your annual standing charge — you pay once for the adaptation and nothing extra afterwards.

Only from 3×35 A do you jump to a higher band, and then the standing charge rises sharply — easily several hundred euros a year, every year. Yet some installers routinely recommend 3×35 A “to be safe”. Always ask: we make a load calculation and only advise heavier if that calculation genuinely requires it.

When you do not need to upgrade at all

If you have single-phase and want to charge at 7.4 kW, you usually need nothing from the grid operator. With load balancing the charger automatically adjusts its power to what the rest of your household is using at that moment, so your main fuse does not trip. That is hundreds of euros cheaper than upgrading and, for most people, more than enough.

How long does the application take?

Allow four to ten weeks between application and execution by the grid operator, depending on workload. We schedule our own work around it: the preparation in the meter cupboard we can do beforehand, so the charger works the same week the upgrade is complete.

Cost overview for a phase upgrade
Installation work TopRenovatie€ 695
Grid operator, 3×25 A one-off± € 369
Application support€ 185
Extra standing charge per year€ 0
Grid operator lead time4 – 10 weeks

Ask every installer this

“Why are you recommending 3×35 A instead of 3×25 A, and can you show me the load calculation?” If there is no clear answer, you are probably paying for years for capacity you do not use.

Everything about three-phase upgrades →

The option most often skipped

Load balancing explained — and why we quote it as standard rather than as an upsell.

An EV charger is the heaviest appliance in your home. Without control it draws its full power regardless of what the rest of the house is doing. That is why we tick this € 265 as standard in the calculator above.

WITHOUT

The classic evening outage

What goes wrong

Car on the charger, oven on, dishwasher on the heat cycle, kettle as well. Together more than your main fuse can take, and the whole house goes dark — with a half-cooked oven.

Happens mainly on 1 phase
STATIC

Fixed limit

Static limiting

The charger is set to a fixed maximum, for example 16 A instead of 25 A. Simple and free, but you always charge more slowly — including at night, when nothing else is on.

Included in the installation
DYNAMIC

Following your consumption

Dynamic load balancing

A meter in the meter cupboard continuously reads your total consumption and steers the charger. When you cook, the car charges more slowly; when everything is off, it speeds up by itself. You always use the full available capacity.

€ 265, incl. meter and setup

When you really need it

On single-phase with 7.4 kW, dynamic load balancing is practically mandatory, or you will trip regularly. On three-phase with 11 kW it is not essential but still wise, especially if you also have a heat pump or induction. If you have solar panels, the control can also send surplus straight to the car instead of the grid — at current feed-in costs that saves more than the investment.

Amsterdam-specific

Charging points in shared underground garages — the Amsterdam reality.

In Amsterdam far from everyone has a private driveway. A charging point in a shared car park is technically straightforward, but it is mainly an organisational process. The technical work takes us a day; the permission usually costs you a meeting.

What is needed technically

  • A connection to the VvE central board, with its own circuit and protection
  • An intermediate meter, so your consumption is settled separately and does not disappear into the service charge
  • Cable tray or mounting rail along the ceiling to your parking space
  • Load balancing, and with multiple chargers a distribution system so the garage supply can cope
  • Fire-resistant penetrations where the cable crosses a compartment boundary

What you need to arrange with the VvE

Since the legal change around charging infrastructure, a VvE (owners’ association) may not simply refuse a reasonable request for a charging point, but it may set conditions: on the execution, insurance, ownership of the installation and who bears the cost on moving. You need a technical file for that.

We prepare that file: a drawing of the route, a load calculation for the garage supply, the installation specifications, our insurance details and a proposal for the meter setup. For € 245 you take something to the meeting that nobody can raise a technical objection to.

Think ahead for the whole garage

If you are the first with a charging point, have us calculate what happens when there are six in three years. A central provision with distribution installed now is cheaper per point than six separate connections added one after another — and it prevents the seventh resident being told it is no longer possible.

VvE charging point — guide prices
Charging point in VvE garage, incl. intermediate meter€ 1.395
Technical file for the meeting€ 245
Cable tray or mounting rail€ 42 / metre
Fire-resistant penetration€ 125
Distribution for multiple chargersfrom € 850
NEN 3140 garage inspectionfrom € 425

We also come just to advise

If your VvE is still in the orientation phase, we are happy to visit once and sketch a realistic picture of costs and options — even if the job later goes elsewhere. Call or request a callback.

More about electrics for VvEs →

EV charging prices · 2026

Full EV charging price list — installation, cabling, upgrades and shared garages.

Installation amounts include materials, labour and 21% VAT. You buy the charger itself separately — we can supply it with no markup if you wish.

Installation & cable runFitting, routing and commissioning
Install 1-phase (7.4 kW) charger, excl. unitper installation€ 625
Install 3-phase (11 kW) charger, excl. unitper installation€ 850
Install 22 kW charger, excl. unitper installation€ 1.150
Cable run beyond the first 10 metresper metre€ 45
Lay buried cable in garden, excl. diggingper metre€ 32
Dig and backfill trench in gardenper metre€ 28
Core drill through façade or floorper penetration€ 95
Fire-resistant penetrationper penetration€ 125
Outdoor mounting on post with baseper post€ 385
Load balancing / dynamic load managementper system€ 265
Commissioning, test charge and app setupincluded€ 0
Consumer unit & supplyBoard, circuits and phase upgrade
Add extra circuit in existing boardper circuit€ 265
RCBO for the charging circuitper unit€ 185
New 1-phase fuse box, 9 circuitsper board€ 945
New 3-phase fuse box, 12 circuitsper board€ 1.345
Upgrade 1 → 3 phase, installation workper home€ 695
Grid operator fee for upgrade to 3×25 Aone-off, passed on± € 369
Grid operator application supportper process€ 185
Install or repair earthingper home€ 425
Solar / inverter circuitper inverter€ 420
Shared garages & landlordsVvE, garage and rental
Charging point in VvE garage, incl. intermediate meterper point€ 1.395
Technical file for VvE permissionper process€ 245
Fit intermediate meter or sub-boardper unit€ 495
Cable tray or mounting railper metre€ 42
Distribution system for multiple chargersper systemfrom € 850
NEN 3140 inspection of garage or commercial spaceper installationfrom € 425
NEN 1010 inspection with reportper installation€ 295
The charger itself — market pricesHardware you buy separately
1-phase charger, 7.4 kWunit€ 500 – 1.200
3-phase charger, 11 kWunit€ 1.000 – 2.500
3-phase charger, 22 kWunit€ 1.200 – 2.500
Uplift for tethered cable instead of socketunit€ 80 – 180

All installation amounts include materials, labour and 21% VAT and apply to Amsterdam and surrounding area. Electrical work always falls under 21% VAT. One exception in your favour: if the meter cupboard is adapted as part of a solar panel installation on your home, that work falls under the 0% rate — tell us beforehand and we will invoice it correctly. Read the full VAT explanation →

Frequently asked questions

Frequently asked questions.

What does it cost to install a home EV charger?

Installation with us starts at € 625 for 7.4 kW on single-phase, € 850 for 11 kW on three-phase and € 1,150 for 22 kW — including materials, labour and 21% VAT, and including the first ten metres of cable. Beyond that we charge € 45 per metre.

You buy the charger itself separately: allow € 500 to € 1,200 for a single-phase model and € 1,000 to € 2,500 for a three-phase model. If your supply needs upgrading, add our installation work of € 695 plus roughly € 369 one-off from the grid operator. A complete home charging point therefore typically lands between € 1,300 and € 2,200 for single-phase, and between € 2,500 and € 5,000 for three-phase.

Do I need to upgrade to three-phase for an EV charger?

Only for 11 kW and 22 kW. A 7.4 kW charger runs fine on single-phase, provided you have dynamic load balancing installed so the charger throttles back when you cook or wash at the same time.

If you do upgrade, 3×25 A is almost always the right answer: it falls into the same tariff band as 1×25 A at the grid operator, so your annual standing charge does not rise. Only from 3×35 A does the standing charge jump sharply. Do not let yourself be sold 3×35 A without a load calculation.

Is 22 kW worthwhile at home?

Rarely. Most electric cars have an 11 kW onboard charger and cannot take 22 kW at all — the charger then simply delivers 11 kW, but you have paid for the dearer installation and often for a heavier supply.

22 kW is worth considering if you charge two cars on one point, if you drive very high business mileage and need short daytime top-ups, or if your car demonstrably has a 22 kW onboard charger. Ask us to look at your model’s specification with you.

What is load balancing and do I need it?

Load balancing makes the charger adjust its power to what the rest of your household is using at that moment. If you cook on induction while the dryer runs, the car charges a little more slowly; when everything is off, it speeds up by itself. That way your main fuse never trips.

On single-phase with 7.4 kW it is practically essential. On three-phase with 11 kW it is not essential but still wise, especially with a heat pump or induction. If you have solar panels, the control can also send surplus straight to the car instead of the grid. We charge € 265 for it, including the meter and setup.

Can I get a charger in a shared VvE garage?

Yes, and since the legal change around charging infrastructure a VvE may not simply refuse a reasonable request. It may set conditions on execution, insurance, ownership and costs on moving.

Technically you need a connection to the central board with its own circuit, an intermediate meter so your consumption is settled separately, a cable tray to your space and a distribution system. A charging point including intermediate meter costs € 1,395. For € 245 we deliver the technical file — drawing, load calculation, specifications and insurance details — that you can take to the meeting.

How long does the installation take?

The fitting itself takes three to six hours, usually half a day. You are without power for about an hour while we connect in the meter cupboard.

If your supply needs upgrading, the grid operator sets the lead time: allow four to ten weeks between application and execution. We do the preparation in the meter cupboard beforehand, so the charger works the same week the upgrade is complete.

Which charger should I choose?

We are not tied to a brand and supply chargers with no markup, so our advice is free. Focus on: a tethered cable or a socket (tethered is more convenient but dearer and more vulnerable), support for dynamic load balancing, a decent app without a subscription, and whether the charger can send solar surplus to the car.

For a rented home or business mileage, a charger with built-in kWh registration and charge-card support is practical so you can claim the consumption. Tell us your situation and we will name two or three models that fit.

Is EV charger installation charged at 21% or 9% VAT?

21%. The reduced 9% rate in the Netherlands applies only to the labour element of insulating, plastering, painting and wallpapering in homes older than two years. Electrical work, including EV chargers, is not on that list.

There is an adjacent rule that can work in your favour: if the meter cupboard is adapted as part of a solar panel installation on your home, that electrical work falls under the 0% rate. If you combine solar and a charger, tell us beforehand — we will then invoice it correctly split.

Do you install EV chargers for English-speaking clients in Amsterdam?

Yes. We install home chargers across Amsterdam and the surrounding area, working in English, Dutch, Russian and Ukrainian. Installation starts at € 625 for 7.4 kW single-phase and € 850 for 11 kW three-phase, including materials, labour, the first ten metres of cable and 21% VAT; the charger itself is bought separately.

If your supply needs upgrading to three-phase, our work is € 695 and the grid operator charges roughly € 369 once. Because 1×25 A and 3×25 A fall into the same tariff band, upgrading to 3×25 A does not increase your annual standing charge.

Are there subsidies for a home EV charger?

There are currently no structural national subsidies for private home chargers; municipal and provincial schemes vary and are sometimes temporarily available. Business drivers can often process the installation through the company and reclaim the VAT.

Because these schemes change regularly, we check at quote stage whether anything applies to your situation at that moment. We do not promise upfront something that later turns out not to exist.

Callback request · 30 seconds

Prefer not to call yourself? We will call you.

Send us a photo of your open meter cupboard and within ten minutes we can say whether you can charge without a phase upgrade — and what it will cost.

01

Within 4 hours, on weekdays

If you choose “as soon as possible”, we call within four hours during office hours. Outside those hours, the next morning.

02

An electrician, not a call centre

You speak to someone who does the work themselves and can already say on the phone what is going on and roughly what it costs.

03

Dutch, English, Russian or Ukrainian

Just mention which language you prefer and we make sure the right colleague calls.

04

No cost, no obligation

The survey at your home is free too, with no call-out fee. You are not tied to anything.

Faster: send a photo of your meter cupboard now

One photo of the open meter cupboard tells us more than ten minutes on the phone. We look at it free of charge and say honestly whether anything needs doing — even if the answer is “no”.

Send photo via WhatsApp
All Reviews 5.0google logoGoogle 5.0
Overall Rating
5.0 8 reviews